About the D3_10_6_webcal Patch

This patch addresses three problems associated with ConnectR and WebCal (Standard and Corporate Editions):

NOTE: This patch restarts the Calendar service. It does not reboot the appliance. The patch can be uninstalled, with the same effect.

Installing the Patch

To install this patch:
  1. Use a telnet client to connect to the administration command-line interface on port 23 on your Mirapoint appliance.

  2. Log in as an administrator.

  3. Issue the following command:
            Version
    
    If version 3.10.6 displays, you can install this patch.

  4. Install the D3_10_6_webcal patch using the following CLI command:
    
            Update Install ftp://ftp.mirapoint.com/pub/updates/D3_10_6_webcal.mpu3
    

Always check the system log after installing a patch regardless of whether installation succeeds or fails.